ERROR: relation "aaa210301_proceeding_action_tracker" does not exist LINE 1: INSERT INTO aaa210301_proceeding_action_tracker(action_track... ^There was an unexpected database error.ERROR: relation "aaa210301_proceeding_action_tracker" does not exist LINE 1: INSERT INTO aaa210301_proceeding_action_tracker(action_track... ^There was an unexpected database error.Management Accounting Section Midyear Meeting: Do Performance-Contingent Incentives Help or Hinder Divergent Thinking?

Management Accounting Section Midyear Meeting

Individual Submission Summary
Share...

Direct link:

Download

Do Performance-Contingent Incentives Help or Hinder Divergent Thinking?

Tue, January 5, 5:00 to 6:30pm, TBA

Abstract

Divergent thinking generates multiple unconventional approaches to a problem or challenge. However, claims from prior experimental studies that incentives hinder divergent thinking often involve problems that have only one solution. In our first experiment, we replicate the negative effect of performance-based incentives in such settings, finding that participants solve fewer insight problems under performance-based pay than under fixed pay. But in a second experiment in which we retain the same key constraints of these problems but modify the assumptions to allow more than one unconventional solution, participants with performance-based pay identify significantly more divergent solutions than do their fixed-pay counterparts. In a third experiment, we also find evidence that incentives stimulate divergent thinking when participants design rather than solve insight problems. Overall, our findings suggest that the negative effect of performance-contingent incentives in some settings is more a reflection of the limitations imposed by these settings than the failure of incentives to stimulate divergent thinking.

Author