Search
Program Calendar
Browse By Day
Browse By Time
Browse By Person
Browse By Room
Browse By Track
Browse By Session Type
Search Tips
Virtual Exhibit Hall
Personal Schedule
Sign In
The mega urban project is both paradoxical and complex, involving both political and economic risk. And yet, the mega urban project has also spearheaded and jolted the socio-spatial growth of many Latin American cities through special plans and zones of exception. While certain mechanisms exist (Flybvjerg 2014; Lungo 2002) that provide guidance to planning and decision-making for the mega urban project, this paper argues that it is still a highly contentious process that is elusive and indefinable. Instead, this paper uses the case study of the Quito’s burgeoning metro rail, MetroQ, to demonstrate historic path dependence between the planning process behind the mega urban rail project and previous transit infrastructure interventions. It uses evidence collected from fieldwork conducted between 2012-2014 to demonstrate that the logic and decision-making process to the MetroQ is similar to and dependent on past transit planning schemes in Quito. Drawing from previous territorial plans, policy documents, and semi-structured interviews, this paper will triangulate these sources to demonstrate how and give logic to the transit system of Quito. In doing so it will demonstrate that the planning behind the MetroQ is linked to and inseparable from the transit decision-making strategies of the past.